Challenge
High turbine backpressure and degraded condenser performance led to efficiency losses, reduced output, and higher operating costs — especially during peak summer conditions.
Navik Solution
Comprehensive condenser performance assessment including tube fouling analysis, air ingress detection, cooling water system optimization, and vacuum system evaluation.
Results
✔ 10–15 mbar reduction in turbine backpressure
✔ 35–50 kcal/kWh heat rate improvement
✔ 3–5 MW net unit output gain
✔ 0.3–0.5% auxiliary power reduction
✔ 3–5 MW net unit output gain
✔ 0.3–0.5% auxiliary power reduction
Client Impact
Delivered sustainable performance recovery through low-capex engineering interventions, improving plant efficiency, reliability, and profitability.
Sector: Thermal Power | Service: Performance Optimization
Disclaimer : The technical data and project information presented in this case study are indicative and provided for knowledge-sharing purposes only. Navik Enterprises makes no warranties regarding accuracy, completeness, or fitness for a particular purpose and disclaims liability arising from reliance on this material.
